![]() ![]() Direct EB supply to lights in case of failure of Battery/InverterĤ. Hence additional capacity of battery and SPV panel required for more autonomy is reduced, resulting in huge capital saving.ģ. Provision of grid back up avoids requirement of autonomy for more than a day. ie., even if it is raining for 3 days the system will work as the required energy for 3 days is generated by the panel & stored in the battery. MNRE design of solar system is with 3 day autonomy. Smart power conditioning unit to charge the battery from grid only in rainy or cloudy days when solar power is insufficient.Ģ. The solar home lighting system is with grid backup and has following innovative features:ġ. These CFLs/ LEDscan be operated for 5 hrs a day. The solar lighting system consists of 5 nos CFLs/ LEDsone each in Living room, Bed room, Kitchen, Toilet & Verandah. With approximately Rs 39.42 Cr subsidy from MNRE. Out of 180 Cr the eligible subsidy from Ministry of New and Renewable Energy, GOI will be appx Rs.42.6 Crįor the year 2012-13, 60,000 Houses have been takenup and are being provided with 49650 CFL based, 10,350 LED based solar power lighting system at an estimated cost of Rs 180 Cr. Under this scheme 3 lakh houses will be constructed with solar powered lighting systems over a period of 5 years from 2011-12 to 2015-16 for the benefit of poor in rural areas.įor the year 2011-12, 60,000 Houses have been taken up and solar powers lighting systems are provided at an estimated cost of Rs.180 Cr. Govt of Tamil Nadu has launched Solar powered Green House Scheme. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |